All News

 

2011

 

BEELINE (ARMENTEL CJSC)

  •  
  •       - More than 50 fire alarm systems installation
  •         - Automatic fire-prevention systems service & maintenance

 

"ORANGE ARMENIA" CJSC ROLLOUT

  •        
  •         - Design & project documentation – 32 projects
  •         - Site construction – 25 sites
  •         - Power line design and construction – 15 lines
  •         - BTS telecom implementation – 23 site
  •         - BTS upgrade – 87 sites
  •         - MW transmission – 49 links
  •         - MW links swap – 85 links
  •         - Telecom power systems – 50 sites
  •         - Field maintenance
  •         - Fiber optic – 17 km
  •         - EMC – 14 projects
  •         - Drive test – 50 links
  •         - Safety improvements – 120 sites
  •         - Grounding restoration – 10 sites
  •         - Mobile site – 1 site
  •         - OA whole network maintenance

 

CENTRAL BANK OF ARMENIA

  •        
  •         - Supply and installation of McAfee data loss prevention system

 

SOUTH CAUCASUS RAILWAY CJSC

Yerevan-Ayrum

  •        
  •         - Design, supply and implementation of backup link for telecom infrastructure

 

GNC-ALFA CJSC (ROSTELECOM)

  •        
  •         - More than 12 KM “turn-key” FO infrastructure construction, including design, supply and installation

 

K-TELECOM CJSC (VIVACELL-MTS)

  •        
  •         - More than 50 GSM sites construction
  •         - More than 40 sites Alcatel 2G, 3G equipment installations
  •         - More than 50 sites Alcatel 3G equipment installation
  •         - More than 15 KM FO infrastructure construction
  •         - Supply of wooden poles

 

Karabakh Telecom CJSC

Stepanakert city

  •        
  •         - Design, supply and deployment of residential “3Play” ready network

 

Mobitel Georgia

  •        
  •         - Turn-key construction of 26 GSM towers and 1 rooftop site in Mobitel network in Georgia