All News

 

2012

 

K-TELECOM CJSC (VIVACELL-MTS)

  •  
  •       - 50 KM Fiber optic infrastructure construction
  •         - Supply of construction materials

 

ERICSSON AB

  •  
  •       Through Global Sourcing procedure, Redinet CJSC was selected by Ericsson AB and concluded Distributorship Agreement with Ericsson AB. Within this process, Ericsson AB subcontracted Redinet CJSC to implement GSM sites SWAP project for K-Telecom CJSC (VivaCell-MTS) in 2012-2013. The scope of the project included:
  •  
  •         More than 440 sites surveys reports
  •         - More than 80 sites SWAP
  •         - Materials supply
  •         - Warehouse management
  •         - As-built documentation

 

CENTRAL BANK OF ARMENIA

  •        
  •         - 15 km FO link implementation to CBA branch office in Dilijan town
  •         - Network deployment in CBA “Dilijan” town

 

BEELINE (ARMENTEL CJSC)

  •        
  •         - Site acquisition – 11 sites 2G + 66 sites 3G
  •         - Design & project documentation – 11 projects 2G + 66 projects 3G
  •         - Site construction – 11 sites 2G
  •         - Power line design and construction – 11 lines
  •         - Telecom implementation – 11 sites 2G + 66 sites 3G
  •         - MW links installation – 11 links
  •         - Fire alarm systems – 89 systems deployment
  •         - Supply of cables and wires
  •         - Supply of cables and energy materials
  •         - Supply of optical multiplexors
  •         - Construction of subscriber access network

 

“ORANGE ARMENIA” CJSC

MAINTENANCE AGREEMENT

  •        
  •         - Curative Maintenance
  •         - Preventive Maintenance
  •         - Adaptive Maintenance
  •         - Refueling of Tanks

 

ROLLOUT AND UPGRADES

  •        
  •         - Site construction - 11 sites
  •         - Power line design and construction - 9 lines
  •         - BTS telecom Implementation - 23 sites
  •         - BTS upgrades - 120 sites
  •         - MW transmission - 15 links
  •         - Power lines repair - 31 lines
  •         - Fiber optic line - 10 km
  •         - EMC - 10 projects
  •         - Mobile site - 1 site
  •         - Gensets implementation - 4
  •         - Shelters modification - 3
  •         - Drive test - full coverage
  •         - OA whole network maintenance
  •         - Checking and Cleaning of Sites

 

SOUTH CAUCASUS RAILWAY CJSC

  •  
  •       - Unique design & supply of anchoring clamps for railway poles
  •         - Supply of telecom grade, deep-discharge batteries (Enersys)

 

ELECTRIC NETWORKS OF ARMENIA

  •  
  •       - Supply of relay protection and automation
  •         - Supple of isolators

 

ALSTOM (FRANCE)

MORE THAN 100 KM OPGW IMPLEMENTATION

  •  
  •       - Design and project documentation
  •         - Dismantling of existing grounding wire and transportation to customer
  •       - OPGW implementation and related fittings
  •         - Installation of optical joints
  •       - Final optical measurements
  •         - Verification of optical transmission characteristics
  •         - As-built documentation

 

REPUBLICAN TELECOMMUNICATION CENTER

  •        
  •         - Supply of 2 spectrum analyzers MSA 458

 

VTB ARMENIA

  •        
  •         - Supply of SAFENET’s OPT eTokens

 

ARMECONOMBANK

  •        
  •         - Supply of SAFENET’s  eTokens for OPT authentication

 

ARMENIAN WATER AND SEWERAGE CJSC

  •        
  •         - Procurement and installation of 28 automatization systems, including design, supply and installation of equipment required for automatization systems of the pumping stations operating in the service area of the “AWSC” CJSC, in tandem with Locator CJSC.
  •  
  •         - Introduction of automatization system enabling the utility operator to considerably reduce the work force, increase water supply quality, reduce water losses, electricity consumption, increase water supply hours, reduce the volume of breakdown repairs in the pumping stations.
  •  
  •         - Development of 28 automatization systems for 19 pumping stations and related daily regulation of reservoirs including procurement, supply and installation of required equipment.

 

KOREK TELECOM (IRAQ)

COW AND FULL POWER SUPPLY

  •  
  •       - Supply and assembly of 40 Cell on Wheels (COW), indoor/outdoor with 80 Gensets power supply and MDBs, Shelters, including Climatic Control, Cooling and Healthy systems.
  •  
  •         - Supply and installation of 46 Gensets and ATS

 

GSM NETWORK IMPLEMENTATION

  •        
  •         - 10 sites construction
  •         - 2G SWAP with Ericsson and 3G addition
  •         - MW SWAP

 

MOBITEL GEORGIA

  •        
  •         - Construction of 30 to 40 meter telecom towers in GSM sites - 4
  •         - Construction of rooftop sites – 3
  •         - Construction of micro BTSs in GSM sites – 2
  •         - Microwave transmission antenna installation for a 93 km radio hop - 1
  •         - Modernization of GSM site with installation of solar panels % batteries for signal amplification - 1

 

IT SECURITY PROJECTS IN THE GEORGIAN BANKS

HALYK BANK OF GEORGIA

  •  
  •       - Supply of e-Tokens
  •         - Supply of SAFENET’s OPT Generators

 

LIBERTY BANK OF GEORGIA

  •        
  •         - Supply of Hardware Security Module (HSM)

 

CARTU BANK OF GEORGIA

  •        
  •         - Supply of ORACLE Premier Support Software Update License and Support